ASHIATECH Successfully completed the following projects in Malaysia & Singapore
KASAWARI CPP TOPSIDE PROJECT – MALAYSIA MARINE & HEAVY ENGINEERING (MMHE) SDN BHD, JOHOR, MALAYSIA.
MECHANICAL AND PIPING SYSTEM INSTALLATION PACKAGE
PERIOD : DECEMBER 2021 – ONGOING
STATUS : ONGOING
1,200MW CCGT POWER GENERATION PLANT PROJECT, PULAU INDAH, KLANG, SELANGOR, MALAYSIA.
ELECTRICAL AND INSTRUMENTATION PACKAGE - INSTALLATION, TESTING AND COMMISSIONING WORKS
PERIOD : MARCH 2022 – ONGOING
STATUS : ONGOING
PROJECT AURORA – 130MW CCGT POWER PLANT, NUR POWER SDN BHD, KULIM, KEDAH, MALAYSIA.
- ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE FOR ELECTRICAL & ELECTRONIC BUILDING, HEAT RECOVERY STEAM GENERATOR (HRSG) SYSTEM, BYPASS STACK SYSTEM, STEAM TURBINE GENERATOR SYSTEM, & AIR COOLED CONDENSOR SYSTEM.
PERIOD : OCTOBER 2023 – ONGOING
STATUS : ONGOING
SHELL ROSMARI-MARJORAM ONSHORE GAS PLANT PROJECT, BINTULU, SARAWAK, MALAYSIA.
- ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE
PERIOD : OCTOBER 2024 – ONGOING
STATUS : ONGOING
PUSAT SAINS NEGARA, KUALA LUMPUR, MALAYSIA.
INSTALLATION OF DATABASE SERVER & EXTERNAL BACK-UP SYSTEM (NAS)
INSTALLATION OF SERVER RACK
APPLICATION OF SOFTWARE INTEGRATION
PERIOD : MAY 2021 – JUNE 2021
STATUS : COMPLETED
INFINEON TECHNOLOGIES, MELAKA, MALAYSIA
INSTALLATION, TESTING & COMMISSIONING OF FIBER NETWORK SYSTEM PACKAGE
PERIOD : JANUARY 2021 – SEPTEMBER 2021
STATUS : COMPLETED
PETRONAS INTERGRATED COMPLEX, PENGERANG, JOHOR, MALAYSIA.
INSTALLATION, TESTING & COMMISSIONING WORK FOR SOLAR PANEL SYSTEM PACKAGE
PERIOD : OCTOBER 2021 – FEBRUARY 2022
STATUS : COMPLETED
PV-ezRACK SOLAR TERRACE WITH C STEEL RAIL, PENGERANG, JOHOR, MALAYSIA.
ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE
PERIOD : FEBRUARY 2022 – APRIL 2022
STATUS : COMPLETED
PETRONAS CHEMICALS METHANOL PLANT, WILAYAH LABUAN, MALAYSIA.
ELECTRICAL AND INSTRUMENTATION PACKAGE - INSTALLATION, TESTING AND COMMISSIONING WORKS
PERIOD : MARCH 2022 – MARCH 2023
STATUS : COMPLETED
DUTCH LADY ‘BIG BLUE’ PROJECT, NEGERI SEMBILAN, MALAYSIA.
EARTHING SYSTEM INSTALLATION PACKAGE
PERIOD : JUNE 2022 – NOVEMBER 2022
STATUS : COMPLETED
SK NEXILIS (MALAYSIA), COPPER FOIL PLANT PROJECT, KOTA KINABALU, SABAH, MALAYSIA.
ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE
ERECTION, TESTING, FILTRATION AND COMMISSIONING PACKAGE FOR 145kV TRANSFORMER
ERECTION, TESTING, FILTRATION AND COMMISSIONING PACKAGE FOR 132kV GIS
PERIOD : JULY 2022 – MARCH 2024
STATUS : COMPLETED
PETRONAS CHEMICAL GROUP - SAMUR PROJECT, SIPITANG, SABAH, MALAYSIA.
ELECTRICAL & INSTRUMENTATION MAINTENANCE PACKAGE FOR COOLING TOWER
PERIOD : SEPTEMBER 2023 - APRIL 2024
STATUS : COMPLETED
SARAWAK PETCHEM METHANOL PLANT PROJECT, BINTULU, SARAWAK, MALAYSIA.
ELECTRICAL AND INSTRUMENTATION PACKAGE - INSTALLATION, TESTING AND COMMISSIONING WORKS
PERIOD : MAY 2022 – SEPTEMBER 2024
STATUS : COMPLETED
PETRONAS GAS PLANT
Electrical and Instrument
Works for KIPC Dungun Water Supply Project.
PERIOD : Apr 2000 to Jun 2002
STATUS : COMPLETED
2,242MW CCGT POWER PLANT, MELAKA, MALAYSIA.
ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE
ERECTION, TESTING, FILTRATION AND COMMISSIONING PACKAGE FOR TRANSFORMER, ISOLATED PHASE-BUS (IPB)
Period : AUGUST 2019 – DECEMBER 2020
STATUS : COMPLETED
GS PAPERBOARD & PACKAGING PLANT – PM3 , KUALA LANGAT, BANTING, SELANGOR, MALAYSIA
ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE FOR 11-STOREY OFFICE BLOCK, 4-STOREY PRODUCTION BLOCK & 5-STOREY CUB BLOCK.
Period : PERIOD: AUGUST 2020 – AUGUST 2021.
STATUS : COMPLETED
7-STOREY BUSINESS COMPLEX, KANGAR, PERLIS, MALAYSIA.
ELECTRICAL INSTALLATION PACKAGE
Period : OCTOBER 2020 – JANUARY 2021
STATUS : COMPLETED
REPSOL OIL & GAS MALAYSIA LIMITED, KLCC, KUALA LUMPUR, MALAYSIA.
MAINTENANCE AND TROUBLESHOOT WORKS FOR SECURITY ACCESS AND CCTV SYSTEM
Period : June 2021 – July 2021
STATUS : COMPLETED
2 x 1000MW (2GW) JIMAH EAST COAL-FIRED POWER PLANT (TUANKU MUHRIZ POWER STATION), PORT DICKSON, NEGERI SEMBILAN, MALAYSIA.
ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE FOR AUXILIARY BOILER
Period : FEBRUARY 2018 – JUNE 2019
ERECTION, TESTING & COMMISSIONING FOR INSULATED PHASE-BUS (IPB)
Period : APRIL 2018 – AUGUST 2018
ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE
Period : FEBRUARY 2018 – NOVEMBER 2019
ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE
Period : JUNE 2016 – JANUARY 2019
STATUS : COMPLETED
PETRONAS LNG RGT (DEEP WATER SEA TERMINAL) PACKAGE, PENGERANG, JOHOR, MALAYSIA.
ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE
Period : FEBRUARY 2016 – DECEMBER 2018
STATUS : COMPLETED
BASF LEMANGRSS PROJECT –GEBENG KUANTAN
(Piping & Mechanical Installation works)
Period : November 2015 - December 2016
STATUS : COMPLETED
KV MRT Project – KUALA LUMPUR
Electrical Cable Tray, Panel Installation, cable laying and Termination works
Period : September 2015 - December 2016
STATUS : COMPLETED
TENAGA NASIONAL BERHAD 1,071MW CCGT POWER PLANT, PRAI, PULAU PINANG.
ELECTRICAL & INSTRUMENTATION INSTALLATION PACKAGE FOR 2 UNITS OF BOILER
ERECTION, TESTING, FILTRATION & COMMISSIONING FOR TRANSFORMER
INSTALLATION OF INSULATED PHASE-BUS (IPB) AND BUS DUCT SYSTEM
PERIOD : PERIOD : JANUARY 2014 – NOVEMBER 2016
STATUS : COMPLETED
LRT LINE EXENTION PROJECT
From Sri Petaling to
Putra Heights-Track slipper lying, Rail lying, Flush butt
welding, Rail grinding, Rail clipping, Track alignment.
Period : Oct 2013 – Dec 2015
STATUS : COMPLETED
SATORP/Saudi Aramco
Analyzer System Engineering, Project Management for Samsung-Chiyoda Consortium, Jubail, Saudi Arabia.
Period : Jan 2011 – March 2012
STATUS : COMPLETED
SAUDI ARAMCO
Sales Gas Analysis for Custody Transfer System for Elster Instrument, Belgium.
Period : Sep 2011 – May 2012
Sales Gas Analysis for Custody
Transfer System for Chevron-Juaymah Gas Plant.
Period : Mar 2001 – Dec 2009
Design of Satellite Instrument
Buildings, control rooms, communication system shelters for
Fluor Arabia
Period : Jan 2009 to Dec 2009
STATUS : COMPLETED
Impress Ethanol/KNM Process System
Project Management of Electrical & Instrumentation system for 200,000 LPD Ethanol Plant, Thailand.
Period : Jan 2012 – Dec 2012
P&Id
Development, Electrical & Instrumentation Design and
Consultancy for 200,000 LPD Ethanol Plant, Thailand.
Period : Jan 2011 – Sept 2011
STATUS : COMPLETED
ERecron Malaysia Sdn Bhd
Electrical & Instrumentation Works for Polyester Yarn Manufacturing Plant, Nilai.
Period : Aug 2011 – Mar 2012
STATUS : COMPLETED
Tatweer Petroleum, Bahrain
Design / Engineering for Local I/O Rooms and Central Control Rooms
Period : Dec 2010 to April 2011
STATUS : COMPLETED
Emerson Process Management Sdn Bhd
Radar Level Transmitter works for GPP B, Petronas, Paka, Terengganu.
Period : April 2011 – May2012
Design &
Installation of
Redundant Transmitters and Voting
System for ASU 2, CUF Kerteh, Petronas.
Period : July 2010 –Mar 2011
STATUS : COMPLETED
ECOLEX
Electrical & Instrumentation works
at Microphyll Plant , Phase 1.
Period : Jan 2010 to Feb 2010
STATUS : COMPLETED
BAKUN HYDRO POWER
Supply, Installation &
Commissioning of Main Switchboard – LV Panels.
Period : July 2009 to Nov 2009
STATUS : COMPLETED
Mission II Biodiesel
Electrical & Instrumentation
Design and Installation Works for Biodiesel Plant.
Period : Dec 2008 to Sep 2009
STATUS : COMPLETED
EcoFeed Sdn Bhd
Electrical & Instruments Works for
Tank Farm.
Period : Mar 2009 to Jun 2009
STATUS : COMPLETED
Eco-Oil Processors Sdn Bhd
Total Instrumentation
works including Cabling, Installations, Hook-up &
Commissioning for Waste Recovery Plant.
Period: Jun 2008 to Oct 2008
STATUS : COMPLETED
Mewah Oils (M) Sdn Bhd
Electrical & Instruments
Design and installation for Packing Plant & Physical
Plant M3.
Period : Feb 2007 to Nov 2007
Electrical & Instruments
Design and installation for Fractionation Plant, Tank
Farm II & Micro pill Plants.
Period : Jun 2004 to May 2005
Instrument System
Design,
Installation and Testing for Physical & Fractionation
Plants.
Period : Dec 2001 to May 2002
STATUS : COMPLETED
Golden Jomalina Food Industries
Electrical &
Instruments Design and installation for Loading Arm
Controls and Ghee Blending System.
Period : Nov 2006 to Feb 2007
Water Path / PUAS
Electrical & Instruments
Design,
Construction & Testing for Water Pumping Station at
Sungai Buloh.
Period : Jun 2004 to Apr 2005
STATUS : COMPLETED
Hartasuma -JPP
Electrical Design, Construction and
Commissioning of STP & CSTF.
Period : Aug 2003 to Dec 2004
P&ID Preparation and Design Project
Management for STP & CSTF.
Period : Aug 2003 to Dec 2003
STATUS : COMPLETED
OFF-SHORE CPI (M) Sdn Bhd / EPMI
Design &
Engineering of Skids.
Period : Feb 2002 to Apr 2002
STATUS : COMPLETED
Metal Reclamation Industries Bhd
Design of LPG
Firing
System for Refinery Kettles.
Period : Aug 2001 to Oct 2001
STATUS : COMPLETED